• Work
  • About Me
  • Contact

karla lockhart

  • Work
  • About Me
  • Contact

Dynamic Parametrics

CRITIC / CHRIS KRONER

COMPLETED / SPRING 2013

A cross-sectional analysis was performed to understand the construction and tectonics of connective infrastructure of a bridge. 

The La DeVasa Footbridge (Ripoli, Spain) designed by Santiago Calatrava was explored and manipulated to perform tectonic kinetic time-based design showing precision, craft, environment and technical clarity.

This 2-minute animation titled ‘Tectonic Kinematics’ can be found at: www.vimeo.com/karlalockhart/videos

Deployment, mechanics, temporal operation and construction are the initial means of this animated investigation.      

07_Animation0.jpg
07_Animation2.jpg
07_Animation3.jpg
07_Animation4.jpg
07_Animation5.jpg
07_Animation6.jpg
07_Animation7.jpg
07_Animation8.jpg
07_Animation9.jpg
07_Animation10.jpg
07_Animation11.jpg
07_Animation12.jpg
07_Animation13.jpg
07_Animation14.jpg
07_Animation15.jpg
07_Animation16.jpg
07_Animation17.jpg
07_Linework.jpg
07_Animation1.2.jpg

Powered by Squarespace.